Pod-point home charger lead time?

All Volkswagen ID.4 related discussions
Post Reply
NickF22
Posts: 12
Joined: Sat Jul 31, 2021 9:07 pm

Post by NickF22 »

Does anyone know what the rough lead time is for a pod-point home charger? They want to take full payment before giving any possible details...

VWPilot
Posts: 13
Joined: Thu Jul 29, 2021 5:02 pm

Post by VWPilot »

In my case it was exactly 2 weeks from payment to installation.
Glacier White ID4 Max Pro with 20" Drammen Alloys. B.D.
frankg
Posts: 4
Joined: Fri Aug 13, 2021 9:42 pm

Post by frankg »

I gave up on podpoint after 3 weeks and no indication of an installation date, when they asked me to do a talk through video of the route of the cable from the meter to the external wall. I pointed out that as far as I was aware the cable would need to go through the loft (bungalow) to the attached garage and I was not prepared to clamber into the loft. There was no problem getting my payment refunded, I arranged for a local electrician to fit a charging point - it was fitted within 3 days.
Post Reply